400-ton water-cooled chiller
Central plant, Building C
- Leaving water
- 44.1 °F
- Next PM
- Quarterly, Jan 14
Mechanical
LiveFor a mechanical contractor, Thermal is one system for HVAC, piping and controls work run as one operation, across branches, with subs in the loop. The record sits at the job, not the ticket, so the crews and the back office read from the same file. It is the same equipment record as commercial HVAC, extended for multi-trade work.
Chillers, boilers, air handlers, pumps and cooling towers are each a serialized record with nameplate, readings and visit history, tagged with the trade that works on it.

400-ton water-cooled chiller
Central plant, Building C
Two-cell cooling tower
Roof, on this condenser riser
Chilled-water pump, 40 HP
Isolation valve on this line
The boiler and the air handlers sit elsewhere in the building. They carry the same record and the same agreement.
Hot-water boiler, 3,000 MBH
Boiler room, Building C
Air handler, third floor
Mechanical room 3
A mechanical agreement covers a plant, not one unit. Each piece of equipment keeps its own scope and PM schedule, and the visits come from the agreement by frequency and season.
Inclusions, exclusions and labor-rate overrides are written against each unit, and the technician sees the coverage on the work order.
Quarterly chiller PM, a spring cooling-tower startup and an annual boiler test come from the same agreement, branch-aware, with no one booking them by hand.
Each visit runs against the unit’s own schedule, with the checklist and the last visit’s readings attached.
Central plant, full coverage
Harbor Medical Campus · 3 sites
Each row opens its own work orders from this agreement, and they land on the board with the equipment list.
A phased job stays one work order across every visit and every crew, so history and billing do not split into a ticket per trip.
Boiler replacement, phased
Garfield Middle School · Boiler room
Purchase orders, work assignments and compliance documents for subs and vendors go through the subcontractor portal, not emails the office reconciles by hand.
Insurance and license documents for each sub feed the same compliance queue the office works from.
Labor, material and sub cost capture against the job as it happens, visit by visit.
Agreement and contract margin roll up per branch as well as per account. Dispatch and contract P&L scope to the branches a user can see.
Statuses are current as of October 2026.
No. Same record, same platform. A multi-trade mechanical contractor adds phased jobs, sub coordination and contract-level cost to it. See commercial HVAC.
Thermal does not run certified or union payroll; that stays with a payroll system. You can flag jobs and projects as prevailing-wage in Settings, Billing. Sending the flag to your payroll export is not available yet.
Subs and vendors work through a portal for purchase orders, work orders and compliance documents, which feed the same compliance queue the office uses. See subcontractors.
Cost capture, logging labor, material and sub cost against a job as it happens, works today. Margin rollup across a multi-visit project is early access. See job costing.
Yes. Dispatch and contract P&L scope to the branches a user has access to, so one system runs the operation without every office seeing every other branch’s numbers by default.
We use optional cookies to see how people use this site. You pick which ones to allow.