Commercial plumbing equipment — backflow prevention assemblies, grease/FOG interceptors, commercial water heaters and boilers, sump and sewage-ejector pumps, drain and sewer lines — runs on the same equipment spine as HVAC in Thermal, not a bolted-on module. A plumbing contractor turns on the commercial plumbing pack for their organization from Settings, and plumbing equipment gets its own type definitions and attributes without waiting on a separate product.
This is a real, in-progress vertical pack, and this page says exactly where the line is: eight equipment types, nine inspection templates (backflow, grease pump-out, hydro-jet, camera scan, boiler mechanical and jurisdictional, sump/ejector, fixture PM), a Full PM Bundle agreement plan, self-serve activation, and the deficiency-to-quote pipeline are live today. Enforcing certification (ASSE 5110, journeyman/master plumber) as a dispatch gate is still on the roadmap.
The through-line is recurring obligation, not a one-time visit. Backflow assemblies test annually, grease interceptors pump out monthly or quarterly depending on mounting, and a missed cadence is a code-compliance and cross-connection risk for the customer’s building — not a comfort complaint. That’s why this page argues from the inspection calendar and the deficiency log, the same source data behind PM compliance rate, rather than from margin math.