Case studies
Real problems. Worked through.
The problems commercial service contractors bring to us, how Thermal handles each one, and what it is modelled to change.
A 150-technician equipment service company was billing work weeks after it was done.
3–7 days
faster from finished job to invoice.
A commercial HVAC maintenance contractor was losing contracted visits and price increases between spreadsheets.
270–530 hours
of office scheduling time back a year.
A chiller contractor was retyping every quote into a work order and catching invoice errors after the customer did.
100–330 hours
of office re-entry removed a year.
A union mechanical contractor kept billing the wrong party when one building needed two trades.
5–10 days
sooner to invoice repair labour.
A 75-person HVAC and plumbing contractor was running two offices on a dozen disconnected apps.
1,150–1,900 hours
of retyping removed a year.
Each scenario is built from requirements real contractors sent us, with details changed. Results are modelled, not measured.