Start free

Illustrative scenario

A chiller contractor was retyping every quote into a work order and catching invoice errors after the customer did.

A multi-branch commercial chiller and HVAC contractor in the south-central U.S. runs service, maintenance contracts, retrofit projects and temporary chiller rentals. Accepted quotes were retyped into work orders, one job's visits split into duplicates, and invoices went out with no review. Running quote to invoice in Thermal is modelled to remove 100 to 330 hours of office re-entry a year and catch invoice errors before the customer sees them.

Modelled

100–330 hours

of office re-entry removed a year

Modelled

150–400 invoices

a year corrected before the customer sees them

Modelled

170–330 hours

of office time back from contract visits that create themselves

Modelled from the stated assumptions below. Not a customer result.

What was going wrong?

Sales wrote a quote, and when the customer accepted it the office typed the scope, materials and labour into a new work order, losing detail on the way. A chiller repair often took several visits, and the system treated each one as its own job, so time and status were split across duplicates. Technicians found units on site that were not on file and had no way to add them, so service history started on the wrong record. Invoices went straight out without a manager's review, and errors came back from the customer. Maintenance contracts promised several visits a year, and booking them by hand missed some. Each missed visit put the contract at risk at renewal, and each corrected invoice pushed payment back by weeks.

What did they need?

  1. An accepted quote that becomes the work order, with nothing retyped.
  2. One work order for a job, however many visits it takes.
  3. Units added from the phone when a technician finds one that is not on file.
  4. A manager's review before any invoice goes to the customer.
  5. Contract visits and rental billing that do not depend on someone's memory.

How would Thermal handle it?

Every accepted quote gets typed again.

A quote can offer good, better and best options, and the customer signs the one they want. The accepted quote becomes the work order with its scope, materials and labour, so the field sees what sales sold.

Q-4471Accepted
Option chosen
Better
Signed
On the customer's phone
Work order
WO-31877 created

One job turns into three, and some units are not on file.

One work order carries every visit a job takes, so time and status stay together. Visits on a maintenance contract create themselves on the contract's schedule. When a technician finds a unit that is not on file, they add it from the phone with a nameplate photo.

WO-31877Visit 2 of 3
Visits
3 on one work order
New unit
Added on site
Nameplate photo
Attached

Managers catch invoice errors after the customer does.

A completed work order drafts its invoice, and an approval step holds it for the department manager before it goes out. The manager fixes or approves it, and only then does the customer see it.

INV-20618Awaiting approval
From work order
WO-31877
Reviewer
Service manager
Status
Held until approved

Rental chillers are booked on one sheet and billed from another.

With rentals turned on, the office checks which units are free for the dates, reserves one and quotes it from a rate card. The accepted quote becomes a rental agreement the customer signs, rental invoices recur, and each deploy, return or swap creates its own work order.

Rental agreementOn rent
Unit
Temporary chiller
Rate card
Wholesale, weekly
Rental invoices
Recurring
Return
Work order WO-31902

What would change?

MeasureTodayWith Thermal (modelled)When
Accepted quote to work order
Retyped, 10 to 20 minutes each
Converted; 100 to 330 office hours back a year
First month
Invoices corrected after sending
3% to 8%
150 to 400 a year caught at approval instead
First full month
Contract visits
Booked by hand, some missed
Created from the contract; 170 to 330 office hours back a year
First quarter

How we modelled this

InputValueSource
Accepted quotes a year
600 to 1,000
Thermal assumption
Office time to retype one quote
10 to 20 minutes
Thermal assumption
Invoices a year
5,000
Thermal assumption
Invoices corrected after sending today
3% to 8%
Thermal assumption
Errors the approval step catches before sending
All of those corrected after sending today
Thermal assumption
Maintenance contracts
200
Thermal assumption
Visits per contract a year
5
Thermal assumption
Office time to create and book one visit by hand
10 to 20 minutes
Thermal assumption
Modelled

Re-entry removed = 600 to 1,000 quotes × 10 to 20 minutes ÷ 60 = 100 to 333 hours

Caught before sending = 5,000 invoices × 3% to 8% = 150 to 400 invoices

Visit booking time back = 200 contracts × 5 visits × 10 to 20 minutes ÷ 60 = 167 to 333 hours

Not included: the cost of rollout and training, the manager's time spent reviewing invoices, and any rental revenue or rental billing changes.

Talk through your own requirements.

Straight answers.

Can Thermal run the retrofit projects too?

Yes. Projects carry their own job costing, and progress billing supports retention and AIA G702/G703 pay applications. Branch and department results roll up from the jobs.

Does it work for a smaller company?

Yes. The same quote, work order and invoice records run a single-branch company, and rentals stay off until an owner turns them on.

Is this a real customer?

It is an illustrative scenario built from requirements a real contractor sent us, with details changed. The results are modelled from the assumptions above, not measured.

About this scenario

This is an illustrative scenario, not a customer story. It is built from requirements a real service contractor sent us while choosing software. We changed details so the company cannot be identified, and the results are modelled from the assumptions on this page, not measured at a customer. Your numbers will depend on your volume, your pricing and how your team works today.

Essential cookies remember your choices and are always on.