- HVAC
- Bill the property manager
- Refrigeration
- Bill the tenant
- New job
- Payer set from the rule
Illustrative scenario
A union mechanical contractor kept billing the wrong party when one building needed two trades.
A mid-size union HVAC and refrigeration contractor in Washington State serves property managers whose buildings hold tenants. HVAC work bills to the landlord and refrigeration to the tenant, but invoices kept reaching the wrong payer, and repair labour waited on the supplier's parts bill. Setting the billing rule on the site in Thermal is modelled to invoice repair labour 5 to 10 days sooner and stop misrouted invoices.
5–10 days
sooner to invoice repair labour
54–108 invoices
a year no longer sent to the wrong party
$137k–$274k
cash brought forward per $10M of repair revenue, where customers pay set terms from the invoice date
Modelled from the stated assumptions below. Not a customer result.
What was going wrong?
Many buildings had two payers. HVAC work billed to the property manager and refrigeration work billed to the tenant, but the dispatcher knew the trade, not the rule, so invoices went to the wrong party, were rejected and came back for rework. Rates and parts prices differed by customer and were applied by hand, so the company billed too much in some places and too little in others. The office would not invoice repair labour until the supplier's parts bill arrived, which held up cash for a week or more. Purchase orders and supplier bills often disagreed on price or quantity, and matching them took office time every week. Every rejected invoice cost rework in the office and pushed payment out by weeks.
What did they need?
- The payer chosen by the site and the trade, not by memory.
- Customer pricing applied the same way on every job.
- Repair labour invoiced when the work is done, not when the parts bill arrives.
- Purchase orders, receipts and supplier bills checked against each other.
How would Thermal handle it?
HVAC bills the landlord and refrigeration bills the tenant.
The office sets a billing rule on the service site for each trade, naming who pays. When a job is created at that site, Thermal picks the payer from the rule for that trade, so the invoice goes to the right party from the start.
Every customer has its own prices.
Parts and labour come from the price book. Each customer has a default pricing tier (Standard, Member or Commercial), and new lines on that customer's jobs start at that tier instead of being priced by hand. A line can still use a different tier when the job calls for it.
- Tier
- Commercial (customer default)
- Compressor contactor
- $148 list, $126 tier
- Applied
- Default on each new line
Repair labour waits on the supplier's bill.
A completed work order drafts its invoice with labour and parts at the customer's prices. The part's cost lands on the job later, from the receipt, so the invoice does not wait for it.
- Labour
- 3.5 h
- Parts
- 2 lines at tier price
- Supplier bill
- Not yet received
- Draft invoice
- INV-31127 ready
Purchase orders and supplier bills never match.
Purchases go through an approval step, and the materials reconciliation report checks purchasing against receipts and receipts against supplier bills, so a mismatch points at the record where it started.
- Lines matched
- 11 of 12
- Line 7
- Billed $18.40 over the order
- Approved by
- Purchasing lead
What would change?
How we modelled this
Misrouted invoices avoided = 6,000 × 30% × 3% to 6% = 54 to 108 a year; × 30 minutes = 27 to 54 hours
Cash brought forward = $10M ÷ 365 × 5 to 10 days = $136,986 to $273,973 per $10M of repair revenue
Matching time back = 1 to 3 hours × 50 weeks = 50 to 150 hours
Not included: the cost of rollout and training, union payroll, sales and use tax, customers who pay on a fixed calendar date whatever the invoice date, and any margin recovered from consistent parts pricing.
Talk through your own requirements.
Straight answers.
Does Thermal run union payroll?
No. Thermal exports technicians' approved hours. Burdened rates, dues, certified payroll and overtime rules stay in your payroll system.
What if the tenant and the landlord share one job?
The billing rule picks one payer per trade at a site. Work that splits one trade between two payers needs separate jobs.
Does it work for a non-union company?
Yes. Billing rules, pricing tiers and reconciliation work the same way whether or not the technicians are union members.
Is this a real customer?
It is an illustrative scenario built from requirements a real contractor sent us, with details changed. The results are modelled from the assumptions above, not measured.
About this scenario
This is an illustrative scenario, not a customer story. It is built from requirements a real service contractor sent us while choosing software. We changed details so the company cannot be identified, and the results are modelled from the assumptions on this page, not measured at a customer. Your numbers will depend on your volume, your pricing and how your team works today.