Start free

Illustrative scenario

A union mechanical contractor kept billing the wrong party when one building needed two trades.

A mid-size union HVAC and refrigeration contractor in Washington State serves property managers whose buildings hold tenants. HVAC work bills to the landlord and refrigeration to the tenant, but invoices kept reaching the wrong payer, and repair labour waited on the supplier's parts bill. Setting the billing rule on the site in Thermal is modelled to invoice repair labour 5 to 10 days sooner and stop misrouted invoices.

Modelled

5–10 days

sooner to invoice repair labour

Modelled

54–108 invoices

a year no longer sent to the wrong party

Modelled

$137k–$274k

cash brought forward per $10M of repair revenue, where customers pay set terms from the invoice date

Modelled from the stated assumptions below. Not a customer result.

What was going wrong?

Many buildings had two payers. HVAC work billed to the property manager and refrigeration work billed to the tenant, but the dispatcher knew the trade, not the rule, so invoices went to the wrong party, were rejected and came back for rework. Rates and parts prices differed by customer and were applied by hand, so the company billed too much in some places and too little in others. The office would not invoice repair labour until the supplier's parts bill arrived, which held up cash for a week or more. Purchase orders and supplier bills often disagreed on price or quantity, and matching them took office time every week. Every rejected invoice cost rework in the office and pushed payment out by weeks.

What did they need?

  1. The payer chosen by the site and the trade, not by memory.
  2. Customer pricing applied the same way on every job.
  3. Repair labour invoiced when the work is done, not when the parts bill arrives.
  4. Purchase orders, receipts and supplier bills checked against each other.

How would Thermal handle it?

HVAC bills the landlord and refrigeration bills the tenant.

The office sets a billing rule on the service site for each trade, naming who pays. When a job is created at that site, Thermal picks the payer from the rule for that trade, so the invoice goes to the right party from the start.

Site billing rules2 trades
HVAC
Bill the property manager
Refrigeration
Bill the tenant
New job
Payer set from the rule

Every customer has its own prices.

Parts and labour come from the price book. Each customer has a default pricing tier (Standard, Member or Commercial), and new lines on that customer's jobs start at that tier instead of being priced by hand. A line can still use a different tier when the job calls for it.

Price bookCustomer tier
Tier
Commercial (customer default)
Compressor contactor
$148 list, $126 tier
Applied
Default on each new line

Repair labour waits on the supplier's bill.

A completed work order drafts its invoice with labour and parts at the customer's prices. The part's cost lands on the job later, from the receipt, so the invoice does not wait for it.

WO-40552Complete
Labour
3.5 h
Parts
2 lines at tier price
Supplier bill
Not yet received
Draft invoice
INV-31127 ready

Purchase orders and supplier bills never match.

Purchases go through an approval step, and the materials reconciliation report checks purchasing against receipts and receipts against supplier bills, so a mismatch points at the record where it started.

PO-77181 exception
Lines matched
11 of 12
Line 7
Billed $18.40 over the order
Approved by
Purchasing lead

What would change?

MeasureTodayWith Thermal (modelled)When
Repair labour to invoice
5 to 10 days, waiting on the parts bill
The day the work order completes
First full month
Invoices to the wrong party
3% to 6% at two-payer sites
54 to 108 fewer a year; 27 to 54 hours of rework avoided
Once site rules are set
Matching orders to bills
1 to 3 hours a week
50 to 150 office hours back a year
First quarter

How we modelled this

InputValueSource
Invoices a year
6,000
Thermal assumption
Share at sites with two payers
30%
Thermal assumption
Of those, sent to the wrong party today
3% to 6%
Thermal assumption
Rework per misrouted invoice
30 minutes
Thermal assumption
Days repair labour waits on the parts bill today
5 to 10
Thermal assumption
Repair labour invoiced on the day the work order completes
Yes
Thermal assumption
When customers pay
A set number of days after the invoice date, so an earlier invoice is paid earlier
Thermal assumption
Revenue per day per $10M of repair revenue
about $27,400 ($10M ÷ 365)
Arithmetic
Office time matching orders to bills saved
1 to 3 hours a week, 50 weeks
Thermal assumption
Modelled

Misrouted invoices avoided = 6,000 × 30% × 3% to 6% = 54 to 108 a year; × 30 minutes = 27 to 54 hours

Cash brought forward = $10M ÷ 365 × 5 to 10 days = $136,986 to $273,973 per $10M of repair revenue

Matching time back = 1 to 3 hours × 50 weeks = 50 to 150 hours

Not included: the cost of rollout and training, union payroll, sales and use tax, customers who pay on a fixed calendar date whatever the invoice date, and any margin recovered from consistent parts pricing.

Talk through your own requirements.

Straight answers.

Does Thermal run union payroll?

No. Thermal exports technicians' approved hours. Burdened rates, dues, certified payroll and overtime rules stay in your payroll system.

What if the tenant and the landlord share one job?

The billing rule picks one payer per trade at a site. Work that splits one trade between two payers needs separate jobs.

Does it work for a non-union company?

Yes. Billing rules, pricing tiers and reconciliation work the same way whether or not the technicians are union members.

Is this a real customer?

It is an illustrative scenario built from requirements a real contractor sent us, with details changed. The results are modelled from the assumptions above, not measured.

About this scenario

This is an illustrative scenario, not a customer story. It is built from requirements a real service contractor sent us while choosing software. We changed details so the company cannot be identified, and the results are modelled from the assumptions on this page, not measured at a customer. Your numbers will depend on your volume, your pricing and how your team works today.

Essential cookies remember your choices and are always on.