- Draft invoice
- INV-8812 same day
- Hours
- Approved
- Payroll
- In this week's hours file
Illustrative scenario
A 75-person HVAC and plumbing contractor was running two offices on a dozen disconnected apps.
A 75-person HVAC and plumbing contractor in the Upper Midwest ran two offices on an older on-premise accounting system and about ten separate apps for dispatch, forms, quoting and payments. Every ticket was typed twice and invoices waited for payroll. Moving field work into Thermal, with accounting moved to QuickBooks Online or Business Central, is modelled to remove 1,150 to 1,900 hours of retyping a year.
1,150–1,900 hours
of retyping removed a year
5–6 days
sooner from finished job to invoice
$137k–$164k
cash brought forward per $10M of annual revenue, where customers pay set terms from the invoice date
Modelled from the stated assumptions below. Not a customer result.
What was going wrong?
The field ran on separate apps for dispatch, forms, quoting and payments, and none of them talked to the accounting system, so the office retyped every ticket and errors came along with it. Invoices were not sent until payroll had posted, so billing slipped by a pay cycle and month-end dragged. The two offices used different tools, so neither could see the other's schedule or a customer's full history. Warranty and maintenance plans were not tied to the equipment, so covered repairs were sometimes billed and warranty claims went unfiled. Residential customers could not pay on site, and the office chased payment later. Month-end meant reconciling ten apps against the books, and each office had its own way of doing it.
What did they need?
- One system for both offices, with one schedule and one customer history.
- Invoices that go out when the work is done, not when payroll posts.
- No retyping between the field and accounting.
- Warranty and maintenance plans tied to each unit.
- A phone app that works without signal and takes payment on site.
How would Thermal handle it?
Invoices wait for payroll to post.
A completed work order drafts its invoice straight away, separate from payroll. Technicians' approved hours export as a file for the payroll system, so payroll runs on its own schedule and billing no longer waits for it.
Every ticket is typed twice.
Once accounting moves to QuickBooks Online or Business Central, customers sync both ways and invoices and payments post from Thermal, so the office stops retyping tickets. Thermal does not connect to the old on-premise system.
- Customers
- Both ways
- Invoices
- Posted from Thermal
- Payments
- Posted from Thermal
Two offices, two dispatch boards.
Both offices work from one dispatch board, and each dispatcher sees the branches they have access to. With plumbing turned on, dispatch checks a technician's recorded certification against the equipment before the job is assigned.
- East office
- 9 visits, 1 unassigned
- West office
- 7 visits
- Backflow test
- Certified tester only
Covered repairs get billed, and warranty claims go unfiled.
Warranty status and claims live on the unit, checked against its install date and the manufacturer's terms. Maintenance plans create their visits on schedule, and renewals come up in a queue before the end date.
- Installed
- Jun 2024
- Parts warranty
- Until Jun 2030
- Claim
- Filed with the manufacturer
What would change?
How we modelled this
requirement (rounded)
Retyping removed = 50 users × 2 tickets × 3 to 5 minutes × 230 days ÷ 60 = 1,150 to 1,917 hours
Days sooner = 7 days − 1 to 2 days = 5 to 6 days
Cash brought forward = $10M ÷ 365 × 5 to 6 days = $136,986 to $164,384 per $10M of revenue
Not included: the cost of moving accounting and of rollout, subscriptions retired, warranty money recovered, and customers who pay on a fixed calendar date whatever the invoice date.
Talk through your own requirements.
Straight answers.
Does Thermal replace the accounting system?
No. The general ledger, payables, receivables and payroll stay in accounting. This scenario assumes accounting moves to QuickBooks Online or Business Central, which Thermal connects to.
Can technicians take payment on site?
Yes. A technician can collect payment on the job, and a quote can ask for a deposit when the customer accepts it.
What happens when a technician has no signal?
The phone app keeps working. Photos, readings, hours and signatures save on the device and sync when the phone reconnects.
Is this a real customer?
It is an illustrative scenario built from requirements a real contractor sent us, with details changed. The results are modelled from the assumptions above, not measured.
About this scenario
This is an illustrative scenario, not a customer story. It is built from requirements a real service contractor sent us while choosing software. We changed details so the company cannot be identified, and the results are modelled from the assumptions on this page, not measured at a customer. Your numbers will depend on your volume, your pricing and how your team works today.